Wednesday 29 May 2013

As Promised - Photographs!


Long over due photos.









All but one 09 Kits run on Kato 11 - 103 chassis.

09 rolling stock by Black Dog Mining (see above links)

009 is a PECO whitemetal kit on Grafar Chassis (Pannier tank) with alterations.

Of course the 7 1.4 Inch runs on a battery powered motor!

Over and out, its late, and I have ran out of steam..!

Chapter 2 Part 2

So for as long as I can remember, I took great pleasure in drawing track plans.

School books, Academic books, Envelopes, Tissues (unused if course, although some greenery always added to the fun!) They were all fair game! but this eventually became too "messy" My collection of designs were not organised at all.

So recently I have decided on a specific "pad" of A3 size paper and stationary too aid in my designing,

This is where "Barrow-Wight Halt" was born. I roughed out a design 1' wide x 5' in length with two 1' x 1.5' fiddle yards on each end. So 8 feet in total. Being keen to start I created the first fiddle yard baseboard. In a nutshell this was not to my rather OCD liking, so it was sidelined. So today after work, I collected specifically cut wood for the above dimensions. They are stored for a rainy day!

So what to do with this small baseboard?

I have always been keen on micro layouts. Small compact, annoyingly simple, but fun! couple this with an excuse to buy an N gauge shunter, 04 out of preference, and 3 or 4 matching wagons to "play" with, I came up with the idea of an "end of the line yard" with one single turn out.

Imagine if you will a small area, grassy unkempt and grubby, running from under a bridge and there you have it! Project Number 4.

So, I can hear you all say, "so much to do, so little time" unfortunately that is the case. Having completed project 1 (the 09 test track) I have a few months, before I crack on with the biggie (Project 2) I may just fill that time with a small mess about.

We shall see! after all they do say "the best laid plans..." (See what I did there?)

Over and out...

Chapter two

So here we are nearly two months since I started the blog,

Please forgive the radio silence, I have started a new job in the NHS and have had little to no time, to sit and "play trains." 

Having had to steal an hour here, and an afternoon there, I recently decided on 2 small/medium projects and 1 long term.

1. 
Create a basic test track for my 09 Rolling stock. 

2. 
Start a simple end to end "exhibition" layout (a long term effort). End of Western BR steam village halt. Tentatively named "Barrow-Wight Halt" in N gauge - This project will re use the best parts of a stalled American N gauge layout never completed. 

3. 
Due to our blistering summer we are having, I aim to complete coupling bars and pins for my 7 1.4 inch locomotive and take delivery of custom made rolling chassis for my riding truck.

I am looking forward to the 8th June 2013. As it is the 7mm Narrow Gauge Association AGM at Burton on Trent town hall. 1030 - 5pm. http://7mmnga.org.uk/

Once I have twigged how to use my phone properly I shall post pictures!